Agree communication arrangements
On an international project, agree the documentation language, units, drawing formats and decision-makers early. A short coordination brief helps reduce misunderstandings between the investor, designer and fabrication facility. Do not assume every participant uses the same document workflow.
Distinguish fabrication from on-site work
Supply-only steelwork and a complete erection package are different delivery models. Clarify who arranges transport, unloading, equipment and on-site work. Requirements specific to the project country should be identified and checked by the responsible parties before scope confirmation.
Prepare a brief for the first discussion
Share the project country and location, design stage and expected scope. Include available drawings and the schedule. Delivery feasibility should consider technical requirements, logistics and working arrangements; an English-language website does not imply every service is available in every country.
- Location, documentation and division of responsibilities.
- Local requirements and the people responsible for assessing them.
- Delivery, erection and acceptance arrangements.
Your next step
Share your project brief for Poland or another European country with KSH Steel. The office will confirm the possible scope of cooperation.